Year Round Mobile Home
Panorama 35
Asylum close to nature, but also around the city: get to know the 35-year-round mobile home Panorama 35. A cozy and beautifully decorated house can become a small enclave surrounded by nature.
Panorama 35 mobile home is like an exclusive hotel apartment in the bosom of nature. It will provide you with freedom and luxury in the vicinity of beautiful landscapes. Every detail is a testimony to how much importance we attach to design and functional planning of space.
This offer from P&P Homes allows you to enjoy the natural environment throughout the year. It's a comfortable house that is ready to move in. You can place it on the property, in the mountains or on the lake. During the holiday and ski season it will be a fantastic investment for profitable rental.



What do you gain when you have a mobile home in the woods or on the plot? It's a piece of nature owned. It's an opportunity to get energy from nature . This is a place where you can go to calm down, relax, recharge your life energy. Without a time limit. Panorama 35 mobile home will make your vacation exactly where you are! You can have it in both the finished version (version 5.0 - specification at the bottom of the page) and the version for your own interior design.






Panorama 35 is produced in the premium class. It has a finish with excellent quality materials and panoramic windows with access to the terrace. It has high-class equipment (including air conditioning) that ensures comfort like in your own home or apartment. Luxury in a natural and compact version - this is what the Panorama 35 mobile home is like. Thanks to its innovative design, you can completely and quickly remove the chassis without having to install the transport wheels.



- steel welded construction
- structure protected by double applied anti-corrosive paint
- wooden subframe
- steel truss made of square profile
- 80 mm layered PIR board (polyisocyanurate)
- Steico Floor insulation (40mm)
- two layers of MFP board
- covered with Scandinavian spruce (shape: diamond)
- Gori 356 impregnated wooden siding, which is biocidal and anti-bruising
- dwukrotne lakierowanie lakierem zewnętrznym UV firmy TEKNOS (chroni elewacje przed czynnikami atmosferycznymi)
- membrane providing windproofing
- wooden frame in a steel frame - Scandinavian structural timber KVH
- horizontal infill: Steico Flex 036 (40mm); vertical infill: Steico Flex 036 (80mm)
- Steico Multi 5 membrane is used in wet rooms from the inside
- internal structure sheathing: 12mm MFP board
- EPDM membrane
- płyta bitumiczna Steico Universal Black 22mm dająca ocieplenie, zabezpieczenie przed wilgocią i regulująca dyfuzyjność
- outer sheathing made of 12mm MFP board
- Steico Flex 036 insulation (120mm)
- inner sheathing made of 12mm MFP board
- frame construction (wooden)
- insulation and soundproofing: Steico Flex 036 (40mm)
- additionally in wet rooms we use the Steico Multi 5 membrane from the inside
- wall covering made of MFP board (12mm)
- external windows: a 5-chamber profile, a package consisting of two or three glass panes
- steel entrance door with insulation
- electrical
- the building is supplied with 3 phases
- the installation is carried out in the walls in a conduit to the point
- cables are led to one collecting point (target table)
- RTV - installation led outside the building to connect a TV antenna
- plumbing installation
- water is distributed in the walls in a PEX multilayer pipe to a collection point in the bathroom and kitchen
- is prepared for connecting water supply from an external network
- the sewage system is routed in the floor to a collection point in the bathroom and kitchen; there is one output for external connection
- a ventilation duct leading to the kitchen and bathroom
- steel welded construction
- structure protected by double applied anti-corrosive paint
- wooden subframe
- steel truss made of square profile
- 80 mm layered PIR board (polyisocyanurate)
- Steico Floor insulation (40mm)
- two layers of MFP board
- Steico Underfloor 5.5mmecological floor underlay
- vintage larch floor board / vinyl panel / layered wooden board
- covered with Scandinavian spruce (shape: diamond)
- Gori 356 impregnated wooden siding, which is biocidal and anti-bruising
- dwukrotne lakierowanie lakierem zewnętrznym UV firmy TEKNOS (chroni elewacje przed czynnikami atmosferycznymi)
- membrane providing windproofing
- wooden frame in a steel frame - Scandinavian structural timber KVH
- horizontal infill: Steico Flex 036 (40mm); vertical infill: Steico Flex 036 (80mm)
- Steico Multi 5 membrane is used in wet rooms from the inside
- internal structure sheathing: 12mm MFP board
- internal finish
- vintage larch plank or waterproof pine plywood
- HPL veneer
- EPDM membrane
- płyta bitumiczna Steico Universal Black 22mm dająca ocieplenie, zabezpieczenie przed wilgocią i regulująca dyfuzyjność
- outer sheathing made of 12mm MFP board
- Steico Flex 036 insulation (120mm)
- vintage larch plank or waterproof pine plywood
- frame construction (wooden)
- insulation and soundproofing: Steico Flex 036 (40mm)
- additionally in wet rooms we use the Steico Multi 5 membrane from the inside
- wall covering made of MFP board (12mm)
- external windows: a 5-chamber profile, a package consisting of two or three glass panes
- steel entrance door with insulation
- electrical
- the building is supplied with 3 phases
- the installation is carried out in the walls in a conduit to the point
- sockets 3x2.5mm2, lighting 3x1.5mm2
- switchgear with protections
- electrical equipment and lighting installed
- external lighting at the entrance
- LED lighting around the house
- RTV - installation led outside the building to connect a TV antenna
- plumbing installation
- water is distributed in the walls in a PEX multilayer pipe to a collection point in the bathroom and kitchen
- is prepared for connecting water supply from an external network
- the sewage system is routed in the floor to a collection point in the bathroom and kitchen; there is one output for external connection
- venting the sewage system
- flow heater
- cold and hot water distributors
- air conditioning with heating function for the living room and hall (optional there is an air curtain above the entrance door)
- electric heaters in the bedrooms and bathroom
- a ventilation duct leading to the kitchen and bathroom
- concealed cistern with toilet bowl and slow-closing board
- paddling
- shower with shower faucet
- curtain/cab
- sink with cabinet
- mirror
- steel welded construction
- structure protected by double applied anti-corrosive paint
- wooden subframe
- steel truss made of square profile
- 80 mm layered PIR board (polyisocyanurate)
- Steico Floor insulation (40mm)
- two layers of MFP board
- Steico Underfloor 5,5mm ecological floor underlay
- vintage larch floor board / vinyl panel / layered wooden board
- covered with Scandinavian spruce (shape: diamond)
- Gori 356 impregnated wooden siding, which is biocidal and anti-bruising
- dwukrotne lakierowanie lakierem zewnętrznym UV firmy TEKNOS (chroni elewacje przed czynnikami atmosferycznymi)
- membrane providing windproofing
- wooden frame in a steel frame - Scandinavian structural timber KVH
- horizontal infill: Steico Flex 036 (40mm); vertical infill: Steico Flex 036 (80mm)
- Steico Multi 5 membrane is used in wet rooms from the inside
- internal structure sheathing: 12mm MFP board
- internal finish
- vintage larch plank or waterproof pine plywood
- HPL veneer
- EPDM membrane
- płyta bitumiczna Steico Universal Black 22mm dająca ocieplenie, zabezpieczenie przed wilgocią i regulująca dyfuzyjność
- outer sheathing made of 12mm MFP board
- Steico Flex 036 insulation (120mm)
- vintage larch plank or waterproof pine plywood
- frame construction (wooden)
- insulation and soundproofing: Steico Flex 036 (40mm)
- additionally in wet rooms we use the Steico Multi 5 membrane from the inside
- wall covering made of MFP board (12mm)
- external windows: a 5-chamber profile, a package consisting of two or three glass panes
- steel entrance door with insulation
- electrical
- the building is supplied with 3 phases
- the installation is carried out in the walls in a conduit to the point
- sockets 3x2.5mm2, lighting 3x1.5mm2
- switchgear with protections
- electrical equipment and lighting installed
- external lighting at the entrance
- LED lighting around the house
- RTV - installation led outside the building to connect a TV antenna
- plumbing installation
- water is distributed in the walls in a PEX multilayer pipe to a collection point in the bathroom and kitchen
- is prepared for connecting water supply from an external network
- the sewage system is routed in the floor to a collection point in the bathroom and kitchen; there is one output for external connection
- venting the sewage system
- flow heater
- cold and hot water distributors
- a ventilation duct leading to the kitchen and bathroom
- electric heaters in the bedrooms and bathroom
- air conditioning with heating function for the living room and hall (optional there is an air curtain above the entrance door)
- concealed cistern with toilet bowl and slow-closing board
- paddling
- shower with shower faucet
- curtain/cab
- sink with cabinet
- mirror
- kitchen furniture
- conglomerate sink with a sink faucet
- fridge with freezer
- built-in washing machine
- built-in dishwasher
- extendable hood
- 2-burner cooking plate
- led lighting
- a sofa bed with sleeping function for two
- extendable table
- two chairs
- bunk bed
- Double bed with mattress
- closet
- night table